Self-climbing Platform for High-Rise Construction is a modular, high-performance formwork system engineered for walls, columns, and slabs. Manufactured under strict ISO 9001 standards with high-strength components, it ensures rapid assembly, superior concrete surface finishes, and extended reuse cycles on site.
Features & Benefits
Self-climbing Platform Features & Benefits
Crane-Free Self-Climbing
The platform climbs with the building structure, reducing dependence on tower cranes during lifting operations.
Integrated Perimeter Protection
Provides enclosed perimeter protection around working levels to improve safety during high-rise construction.
Multi-Level Working Platforms
Multiple working levels provide dedicated space for construction operations, access, and material handling.
Modular System Design
Modular components allow the platform configuration to adapt to different building layouts and project requirements.
Efficient High-Rise Construction
Continuous climbing with the structure helps reduce repeated dismantling and reinstallation as construction progresses.
Self-climbing Platform Application
Suitable for high-rise and super high-rise buildings, including concrete structural construction, facade works, and perimeter protection applications.
Technical Specifications
Self-climbing Platform SCP Technical Specifications
| System Type | Facade protection system |
| Material | Climbing bracket, anchoring system, electric hoist, electronic control system |
| Standard Bracket Height | 14/16/18 m |
| Covered Floor Number | 4.5 floor |
| Working Platform Tiers | 5 floors |
| Standard Unit Size | 5 m (platform standard affects width) |
| Platform Width | 0.6 m (without side panels) |
| Platform Weight | Approx. 36 kg/m2 (without components) |
| Installation Time | 2 units/day (a group of 6 people) |
| Permissible Live Load | 2.0 kN/㎡ for 3-tier simultaneous operation 3.0 kN/㎡ for 2-tier simultaneous operation |
| Connection Technology | Cantilever beam / high-strength tie rods |
| Climbing Speed | 45 min/floor/area (Total duration including preparation and average resetting times) |
| Assembly Method | Ground level pre-assembly or direct on-structure installation |
| Handling Method | Electric hoist |
Formwork Products You May Also Like
All ProductsProjects Show
All ProjectsYour burning questions, answered
Can you provide solutions for different projects?
We offer a wide range of formwork systems suitable for various solutions.
For example, our products are used in sectors such as bridges, buildings, storage tanks, tunnels, dams, and LNG projects.
Simply send us your project details to receive a solution.
What payment terms do you accept?
L/C or T/T.
What are the unique advantages of your products?
We have an in-house team of designers capable of providing construction and assembly drawings to clients, and we can arrange for engineers to provide on-site assistance when necessary.